Helios One · buyer workflow
Electronics manufacturing supplier on-time delivery tracking
The decision for this workflow
Keep the date result separate from allocation and revision exceptions so a timely but wrong component is not a silent pass. The page uses sample/fictional data so a team can challenge the rule before sharing a real export. It is aimed at a buyer deciding what to ask, what to hold, and what to leave for a human.
Component OTD and revision scorecard
This page’s working artifact is a Component OTD and revision scorecard. It is intentionally narrower than a full ERP rollout: the buyer supplies a reviewed export or copies a supplier message, then checks the proposed state before anything is sent or written back.
Worked fictional example: Fictional ten-line PCB assembly input set
| Field | Fictional value |
|---|---|
| On time | 6 lines by original promise |
| Late | 2 lines, 5 and 9 days late |
| Partial | 1 line received at 70% quantity |
| Revision exception | 1 timely line needs engineering review |
The useful decision is keep the date result separate from allocation and revision exceptions so a timely but wrong component is not a silent pass. In a real review, record the source file, message date, reviewer, and any redaction before treating a value as operational.
What Helios does directly
Helios calculates the fictional timing view and exposes non-timing exception labels for a human decision. Helios keeps the distinction between a draft, an extracted value, and a buyer-approved decision visible. A supplier reply is not sent automatically from this page, and no ERP record is changed by this artifact.
Evidence boundary
This is not a yield, quality, or component-availability benchmark. The three sources below provide industry or vendor context; they do not establish a Helios customer result, certification, or live integration. The p1-stores status is the controlling integration boundary for this wave: 0 live-tested integrations.
Use the related workflow links to prepare the minimum export, draft an acknowledgment, or review a supplier reply. Keep real purchase orders and controlled documents in the approved environment.
Working artifact · fictional sample data
Supplier OTD scorecard
Definition used here: receipt on or before the unmodified supplier promise date ÷ confirmed receipt lines. This sample is not an industry benchmark.
Sources and verification
- IPC standards (primary; accessed 2026-10-23) — IPC provides electronics-industry standards context; this page does not claim certification or conformance.
- EU RoHS directive (primary; accessed 2026-10-23) — The European Commission explains RoHS scope; it does not validate a Helios compliance workflow.
- SourceDay PO collaboration datasheet (primary; accessed 2026-10-23) — SourceDay describes a category workflow; its features and results are not attributed to Helios.
Frequently asked questions
Should a revision exception be counted late?
No. The sample keeps delivery timing and revision acceptance distinct, making both states visible without inventing a quality result.